Back

ED Specialists Deliver a Remarkable Video Wall for the 53rd ISSF World Shooting Championships ED

In a triumphant display of technical prowess, the ED LVS specialist team has erected a colossal 300-square-meter Video Wall for the grand opening ceremony of the 53rd ISSF World Shooting Championships. This achievement stands as a testament to the team's unwavering commitment, strategic problem-solving, and proficiency in navigating tight timelines.

Client: The National Shooting Federation of Azerbaijan (NSFA) and the International Shooting Sport Federation (ISSF), organizers of the 53rd ISSF World Shooting Championships.

Business Challenge: The National Shooting Federation of Azerbaijan (NSFA) and the International Shooting Sport Federation (ISSF) faced the challenge of creating an immersive experience for the grand opening ceremony of the 53rd ISSF World Shooting Championships. To achieve this, a colossal 300-square-meter Video Wall was required, demanding intricate design and swift execution within a tight timeline.

The magnitude of the event necessitated intricate design and swift execution of the installation process within a notably compact timeline. Meticulous planning and highly synchronized workflow were crucial to ensure the completion of the video wall before the commencement of the championships.

decoration element
decoration element

Solution:

The ED LVS specialist team demonstrated technical prowess by erecting a monumental 300-square-meter Video Wall for the grand opening ceremony. Through strategic problem-solving and proficiency, the team navigated tight timelines to ensure the successful completion of the installation.

Set against the picturesque backdrop of Baku, Azerbaijan, the 53rd ISSF World Shooting Championships unfolded from August 28 to September 12, 2023. With over 1,000 athletes from more than 100 countries, the event showcased Azerbaijan's dedication to the world of shooting sports.

decoration element
decoration element

Technology Integration:

The ED team ensured compliance with the stringent standards mandated by the ISSF through the intricate integration of various IT systems. Meticulous attention to detail and a profound understanding of technological interplay were essential for seamless execution.

Technologies: The colossal Video Wall was made possible through the utilization of cutting-edge technologies including:

  • High-resolution LED display panels
  • Advanced video processing software
  • Synchronized audiovisual equipment
  • Customized content management systems
  • Remote monitoring and control systems

These technologies were carefully selected to deliver an immersive visual experience while meeting the rigorous standards set by the ISSF.

decoration element
decoration element